After doing his research, my father has decided to go solar!

Once the studies were done to determine the best locaion for the panels, for maximum sun, the installation guys showed up with the panels.

loading...
loading...
loading...
loading...
loading...
loading...

Panel installation and wiring took about half a day...

Now, my father waits for final approval from the township on the completed installation job, and for the utility to "flip the switch."

And, for lots of sunny days to come...which is up to mother nature.

More From New Jersey 101.5 FM